Columns up to three kilometers, citizens wait up to five hours in Merdara

The border crossing point at Merdara is continuing to remain with the largest influx yet. In the recent update made by the Ministry of Internal Affairs, it is seen that the biggest expectations are registered at the border point in Merdara. Waiting for entry from this crossing point ranges from 10 to 15 [...]
In the recent update made by the Ministry of Internal Affairs, it is seen that the biggest expectations are registered at the border point in Merdara.
The wait for entry from this crossing point ranges between 10 and 15 minutes, while for up to 300 minutes until the exit columns are from 2km.
Long receptions have also been marked at the border point in Vermica, where the waiting point is between 60 and 70 minutes long and the entry column is 3km long.
Long receptions have also been recorded at the White Land border point, where 110 minutes are expected to exit and into 20 minutes. The column at the entrance of this border point is 50m and is at 500m exit.
Even at the Jarinje border point, the exit receptions are between 45 and 50 minutes, and the entrance to 30 minutes. Meanwhile, the entry column is 300m long and is 500 feet [500 m] out.











