Countries to Remain Without Energy

Countries to Remain Without Energy

KEDS reports that in some Kosovo countries there will be no electricity. Here are the ones: On 23,24.07.2018 at NS 110/10)20 Pristina 5 will be interrupted: NS 10/04kV At 9: 00 a.m. and 1: 00: 00: 00 a.m. John [...]

On 23,24.07.2018 at NS 110/10)20 Pristina 5 will be interrupted:

  • NS 10/04kV So what do you do?

During the time the work will last without electricity supply will remain: reg. John Serreqi.

The reason for the break: Locking consumers into new networks.

2.

On 23,24.07.2018 at NS 110/10)20 Pristina 5 will be interrupted:

  • NS 10/04kV The Hertics (Codi: 13000010041) from 09-12 o'clock and 1300-17:00

During time, the work without electricity supply will remain: The Hertic neighborhood.

The reason for the break: Locking consumers into new networks.

Planned maintenance

1.

In 24.07.2018 on TS 35/10 KV Fushe-Kosovo will be interrupted:

  • Exit 10 kV Great White (Codia: 15018018) between 10:00 and 2: 00 p.m.

During the time the work will last without electricity supply will remain: Local 28th, part of Fushe-Kosovo after Hekurland, Kuzmin and the Great White.

The reason for the break: Prevention maintenance of exit 10 kVs.

Ferizaj

COSTT Request off

- No.

Cease necessary for system safety works

- No.

Sudden on third-party request

- No.

Planned maintenance

1.

In 24.07.2018 in TS 110/35/10 KV Lipjan will be interrupted:

  • Exit 10 kV Slovia (Kodi: 4,0003) from 8: 00 p.m. to 2: 00 p.m.

During the time it will last without electricity supplies, villages will remain: Dobratin, Post Augusterica, Livagje, Slovi, Smallusa, Collapek, Glavica and Marevc.

The reason for the break: Switch to the insulators and strain to the conveyors.

2.

In 24.07.2018 at TS 1/1006 Elez' KV Hani will be interrupted:

  • Exit 10kV Globocica (Cody: 40002) from 0800 till 2: 00 p.m.

During the time it will last without electricity supplies, villages will remain: Grloboqica, Rezhaca, Goranca, Hunel, Mellues, Braves, Kolomok Quarters, Sujuku factory, Sequisht, Krivenik and Blessed Stonebreaker.

The reason for the break: Switching insulators and shaking the conveyors.

I Blooded

COSTT Request off

- No.

Cease necessary for system safety works

- No.

Sudden on third-party request

- No.

Planned maintenance

1.

In 24.07.2018 on TS 35/10 KV Malisheva will be interrupted:

  • Exit 10 kV Mirusha (Codia: 82082002) from 0900 to 12: 00 p.m.

During the time the work will be extended without electricity supply will remain: rr.603 Adem Jashar (1 consumer), reg. Imer Krasniqi (7 consumers), p.605 Hamdi Berisha (1 consumer), p.606 Independence (1 consumer), villages: Bulbel, Burim, Caraluke (3 consumers), Damanek, Gur White, Llapcheva, Lubizhda, Lubizhda of Malisheva, Lubisht, Mirusha, Maga, Panorc (a part) and Turjaca.

The reason for the break: Division 10 kV.

2.

In 24.07.2018 on TS 35/10 KV Malisheva will have total interruptions: between 0400 and 12:00

During the time the work will be extended without electricity supply will remain: rr.603 Adem Yasar (a section), reg.605 National Renaissance, 606th. Independence St.610 Hisni Mazreku villages: Caracle, Dragobil, Drenoc, Panorc, Shrashanica, Down and Down, Vermica, Malisheva Vermica, City Hospital, St.608 Hamdi Berisha villages: Balinca, Bubavec, Drenoc, Gollubovc, Kijevo, Lazica, Lubizhda, Mleqan, Ploc, Polluze, Stapanica, .602 Gjergj Kastriot Basja, Bellanica, Gajrak, City Hospital and Dr.608 Hamdi Berisha.

The reason for the break: Forests on the Scada project.

Gjilan

COSTT Request off

- No.

Cease necessary for system safety works

- No.

Sudden on third-party request

- No.

Planned maintenance

1.

In 24.07.2018 on TS 35/10 KV Plain will be interrupted:

  • Exit 10 kV Binqa (Codia: 61067008) between 10:00 and 2: 00 p.m.

During the time the work will last without electricity supplies will remain villages: Mogill, Kabash, Rafta, Bozovic, Shosar and Debelldeje.

The reason for the break: Conspiracy of conveyors.

Peja

COSTT Request off

- No.

Cease necessary for system safety works

- No.

Planned maintenance

1.

In 24.07.2018 on TS 35/10 KV Cline will be interrupted:

  • Exit 10 kV Jagoda (Codi: 52056005) between 10:00 and 2: 00 p.m.

During the time it will last without electricity supplies, villages will remain: Jagoda, Budisalca, Stublla, Lutoglava, and Trstenic.

The reason for the break: Switching poles and cleaning the bag.

2.

On 23,07.2018 in TS 110/10 KV Decani will have total disruptions: between 0600 and 12:00

During the time the work will last without electricity supply will remain: Decan city, Decan KEDS, Decan Police, Devan Gjimnazi, Ramonaj, Hazeraj, KPC, Demhaja, Carrabreg, Beran, Prahani, Brqi, Kragqi, New Kruqaj, Grazaj, Joqejj, Turjaka e Ut, Vranoci i Vokat, Barani, Qallaku, Kusorqi, Lugjagit, Grazani, Grazajkaqnik, Grazajkoli, Fatkali, Balkali, Dubguajni, Dubafit, Lekutkat, Luqajper, Luqajari, Grazajka, Kraka, Kraka, Lrazajbari, Lzakajka, Ferjka, Ferjka, Yrazajbari, Yrazajkoli, Yzaki, Yrazajka, Yrazajqi, Yrazajka, Yzaki, Ferjka, Yrazajka, Yrazajka, Yrazajka, Yrazajka, Yrazajka, Yrazajka, Paka, Tishukaj. Mehmetaj, Mult, Kukleci, Osadautaj. Tahirylaj, Rexjamaj, Osmanaj, Top Luka 1, Mucaj-Luke and ARC.

The reason for the break: Forests on the Scada project.

Sudden on third-party request

1.

On 23.07.2018 at NS 110/10 K V Klin will be interrupted:

  • Exit 10 kV Klinavci (Codi:5,20002) from 0900 till 5:00 p.m.

During the time it will last without electricity supplies, villages will remain: Klinavc, Little Djurdjevik, Krenica, Steupe, Bingj, Grepc, Leskoc, Krusevo e Vogel, Raduloc, Pataqaan, Lla kuqeian, Krusevo the Great, Ranoc, Berkovo and Rudica.

The reason for the break: The assembly of cable heads and the extent of the conveyors.

Prizren

COSTT Request off

- No.

Cease necessary for system safety works

- No.

Planned maintenance

- No.

Sudden on third-party request

1.

In 22.07.2018 on TS 1/1035/10 kV Prizren 1 will be interrupted:

  • Exit 10 kV Rahoveci (Codi: 30000015) between 12: 00 p.m. and 14:30

During the time the work will last without electricity supply will remain: Euro Graniti, Atmaja I, Atmaja II, Touch I, Touchi II, Touchi III, Landovica, Tuttore I and Brick II.

The reason for the break: Network meals.

 

Related
Incident within Special Court, three brothers beat witness

Incident within Special Court, three brothers beat witness

What they say in the CEC, why mandates go from subject to subject during vote count

What they say in the CEC, why mandates go from subject to subject during vote count

Lost control of floating vehicle and fell into water, drowning in 37-year-old Albanian lake

Lost control of floating vehicle and fell into water, drowning in 37-year-old Albanian lake

Migration dispute to continue dominance in Switzerland

Migration dispute to continue dominance in Switzerland

Dejona Mihali passes with his tongue to Progress Rama: Narcotics as you get it

Dejona Mihali passes with his tongue to Progress Rama: Narcotics as you get it

Tragedy in Ksamil: A 22-year-old victim ran into border police

Tragedy in Ksamil: A 22-year-old victim ran into border police

US, Iran sign agreement electronically before official ceremony

US, Iran sign agreement electronically before official ceremony

P file SRK to five suspects in “Recak II”

P file SRK to five suspects in “Recak II”

VV nearly reaches 52 mandates falls back to 51, PDK that lost one returns to 23

VV nearly reaches 52 mandates falls back to 51, PDK that lost one returns to 23

Suspected of stealing 200 euros, 27-year-old Suhareka

Suspected of stealing 200 euros, 27-year-old Suhareka

23rd mandate returns PDK after voting update

23rd mandate returns PDK after voting update

Supreme Court suspends promotional process in Kosovo Police

Supreme Court suspends promotional process in Kosovo Police

Trump: The Hormuz Strait “is partially opened” and will be fully opened Friday

Trump: The Hormuz Strait “is partially opened” and will be fully opened Friday