After the A3 block, the B1 block that produces large amounts of electricity today comes down with an announcement

The energy situation in the country is continuing to deteriorate. After yesterday the Kosovo Energy Corporation announced that the A3 bloc has fallen out of the system, today the B1 has dropped, but it has returned to operation. KEK's announcement says that “in these moments this unit is producing over 210MW/h and shortly [...]
KEK's announcement says that “in these moments this unit is producing over 210MW/h and will soon reach the opitmal capacity of about 260MW/h”.












