The interior audience says the 16 million tender was manipulated: It's a corrupting construction.

Interior audience has asked the Ministry of Environment, Space Planning and Infrastructure - MMPHI is canceling the tender for maintenance of two Kosovo highways, as this procurement activity is manipulated, manipulated and co-ordinated with companies that are recommended for the contract. MMPHI, led by the minister, Lieburn Aliu, had left out [...]
MMPHI, led by the minister, Liburn Aliu, had oddly left out of the auditing group for the auditing of the highway maintenance tender, Begzad Musliu, who is director of the MMPHI Internal Audit Unit.
Two audiences and an official of the Environment Ministry were authorised to conduct the audit, but Musliu calling on his legal responsibilities has made a single report on the entire process of operating this tender's procurement procedure.
Kanal 10 television has published the latest page of the report that was released by the director of the Auditing Unit, Begzad Musliu.
It shows that the audience has asked MMPHI to cancel the tender, since according to him, this procurement activity is manipulated, manipulated and co-ordinated with companies that are recommended for the contract.
“Based on the above-intensive findings, we consolidate that this procurement activity is manipulated, manipulated and co-ordinated with specific economic operators. It's a corrupting construction with huge consequences of financial losses for MMPHI”, says the overall conclusion.
Therefore, according to the audience, to escape the damage to the subject, he has recommended that this procurement activity be immediately cancelled and return to the stage of real planning.
“You must take all legal and disciplinary measures to restore managerial checks to the Road Infrastructure Department and Procuration Division, because you do not have the minimum objective and legal credibility in atrophed management checks”, says this report, which bears the stamp of June 23rd 2022.
On the other hand, even the audit unit that was authorized by Lieburn Aliu has submitted the audit report for this tender procedure several days ago, but the minister is not allowing access to this document. /Periscopi/

The Ministry of Infrastructure does not allow access to Auditor's Report for 16 million tender