10 years from barricade removal on bridge in Mitrovica

The barricade on Ibër's main bridge in Mitrovica, located by northern Serb parallel structures, has finally been removed on 17 June 2014, about 5:00am. The event for removing the barricade set by the so-called <x0rs of the” Bridge, was removed from the same one, and lasted about four hours while it is not [...]
The barricade on Ibër's main bridge in Mitrovica, located by northern Serb parallel structures, has finally been removed on 17 June 2014, about 5:00am.
The event for removing the barricade set up by the so-called <x0orroat bridge” is removed from the same one, and has lasted about four hours, while no incidents have been recorded.
During this action, increased forces of the Kosovo Police and Italian Carabinieri had been observed on the bridge, which did not allow the presence of citizens near the bridge.
Otherwise, the removal of the barricade, which had long divided the town of Mitrovica and prevented freedom of movement, was made by two excavers who had come from the north.
After that, a park was built and then a wall. Both have been removed, but the bridge again was not issued with the argument that the European Union is renewing it. The work has long been finished, but it has not been released.












