The preliminary test report on the bridge, Durmish: The Ibër Bridge is stable, stable, and functional

Infrastructure Deputy Minister Hysen Durmish has announced that he received the report from testing the capacity to maintain the existing bridge structure over the Iber River. As Durmish says, the bridge over the Iber River is stable, stable, and functional. Full Posting: The bridge over the Iber River is stable, stable, and functional we just accepted the report [...]
Infrastructure Deputy Minister Hysen Durmish has announced that he received the report from testing the capacity to maintain the existing bridge structure over the Iber River.
As Durmish says, the bridge over the Iber River is stable, stable, and functional.
Full Posting:
Bridge over the Iber River is stable, stable, and functional
We've just received the report from testing the capacity of maintaining the existing bridge structure over the Iber River. The report clearly concludes that the bridge structure over the Iber River is stable and functional, and as such can be used for exploitation without any restrictions on cargo.
The report we've received today is preliminary, and after which we will expect the final one to have the final results on the functionality of the Ibër bridge in technical terms.












