Azem: Lack of investment in energy production could convert energy mafia ahead with Martin Berisha

The LDK's Visar Azem, through a Facebook status, has written about the energy situation in the country. Azem taking a trigger from the A5 block that according to it produces enough electricity to cover about 13 %s of what Kosovo needs, but that according to Azem, lack of investments in it, which [...]
And it's all according to Azem to convert the power mafia in charge of Marin Berisha, to be converted into ATMs as he calls it, to the prime minister.
Full status:
The A5 block of the Kosova A plant produces enough electricity to cover about 13% of what Kosovo needs. However, this block has been shut out for nine months.
For every day that we have bought electricity to fill the void that the A5 block could cover, Kosovo has paid about 1m euros in daily import.
If this block hadn't dragged in and managed properly, it wouldn't have needed this 15% price hike.
And all of this situation created with a lack of will to invest in production capacities seems to be deliberate and can only counter the energy mafia at the helm with Martin Berisha, to turn into ATMs for the prime minister!










